SCDOT proposes to replace eight closed and load restricted secondary bridges in Greenville and Pickens counties. The project will include replacing the existing bridges and associated roadway work.
Request for Proposals
- Request for Proposals Industry Review (Posted 12/17/24)
Request for Qualifications
- Bridge Package 19 Short-Listed Design Build Teams (Posted 12/17/24)
- SOQ Submitters List (Posted 11/25/24)
- Request for Qualifications - Addendum 1 (Posted 11/14/24)
- Notice to Proposers - Addendum 1 (Posted 11/14/24)
- Non-Confidential Questions and Responses (Posted 11/14/24)
- Request for Qualifications (Posted 10/31/24)
Notice to Proposers
- Early Coordination Advertisement (Posted 10/31/24)
- Early Coordination Meeting Presentation (Posted 10/31/24)
Attachment B - Supplemental Project Design Criteria
Construction
- Miniumum SOV Items- Bridge (Posted 10/31/24)
Geotechnical
- Geotechnical Subsurface Data Report (Posted 12/17/24)
- Field Testing Data Files (Posted 12/17/24)
Hydro
- Toe Ditch Detail (Posted 10/31/24)
- SWPPP Checklist (Posted 10/31/24)
- Package 19 Bridge Length (Posted 11/14/24)
Hazardous Materials
- Asbestos and Lead-Based Paint Reports (Posted 12/17/24)
Roadway
- Roadway Typical Sections_R1 (Posted 11/14/24)
- Non-Mow Strip Guardrail Details (Posted 10/31/24)
- Package 19 Traffic Projections (Posted 10/31/24)
Survey
- Package 19 Survey Files (Posted 10/31/24)
Structures
- R1_Design Criteria for Box Culverts (Posted 11/14/24)
- Roadway Structure Plan Preparation Requirements (Posted 10/31/24)
- Bridge Deck Waterproofing Systems (Posted 10/31/24)
- Acceptable Polymer Slurry Systems (Posted 10/31/24)
Project Information Package
Construction
- Complete List of SOV Items (Posted 10/23/24)
Environmental
- S-23-102 Bridge Replacement Bundle (Posted 10/31/24)
- S-23-310 Bridge Replacement Bundle 8.30.24 (Posted 10/16/24)
- S-23-40 Bridge Replacement Bundle 8.30.24 (Posted 10/31/24)
- S-23-41 Bridge Replacement Bundle 8.30.24 (Posted 10/31/24)
- S-39-32 Bridge Replacement Bundle 8.30.24 (Posted 10/31/24)
- S-40 & S-26 Bridge Replacement Bundle 8.30.24 (Posted 10/31/24)
- S-94 Bridge Replacement Bundle 8.30.24 (Posted 10/31/24)
- P19 Wetland Delineation (Posted 11/14/24)
Geotechnical
- Geotechnical Baseline Report (Posted 12/17/24)
Roadway
- Package 19 Conceptual Roadway Plans_R1 (Posted 11/14/24)
- Package 19 Conceptual Roadway Microstation Files_R1 (Posted 11/14/24)
Structures
- SI&A Package 19 (Posted 10/31/24)
- Conceptual Bridge Plans (Posted 10/31/24)
- Bridge Plan DGN Files (Posted 10/31/24)
- Conceptual Culvert Plan S-310 (Posted 11/14/24)
- Culvert Plan S-310 DGN Files (Posted 11/14/24)
Statement of Qualification Distribution Meeting
A Bridge Package 19 Design-Build Project Statement of Qualification Distribution Meeting will be held on November 25, 2024 at 9:30 am via Microsoft Teams.
The following is the WebEx login information:
Microsoft Teams Meeting Join on your computer or mobile app Click here to Join the Meeting
Meeting ID: 215 186 911 754 Passcode:QvRC66
Or call in (audio only) +1 803-529-1369,,756923258# United States, Columbia Phone Conference ID: 756 923 258#
Statement of Qualification Evaluation Meeting
A Bridge Package 19 Design-Build Project- Statement of Qualification Evaluation Meeting will be held on December 11, 2024 at 8:30 am via Microsoft Teams.
The following is the Microsoft Teams Meeting login information:
Microsoft Teams Need help?
Meeting ID: 256 379 431 431 Passcode: E6zBU4
Dial in by phone
+1 803-529-1369,,107496763# United States, Columbia Phone conference ID: 107 496 763#
For organizers: Meeting options | Reset dial-in PIN
Bridge Package 19 SOQ Evaluation Meeting Agenda