SCDOT proposes to replace the existing S-31 bridge over Peters Creek in Spartanburg County. This project includes construction of the new bridge structure and associated road work with an accelerated schedule.
Request for Proposal
- P041165_Contractor Selection Memo (Posted 4/7/25)
- P041165_Request for Proposals (Posted 4/4/25)
- P041165_Request for Proposals (with Revisions Highlighted) (Posted 4/4/25)
- P041165_Non-Confidential Questions and Answers_R2 (Posted 4/3/25)
- P041165_Request for Proposals for Industry Review #2 with Revision 1 (Posted 3/31/25)
- Request for Proposals for Industry Review #2 (Posted 3/27/25)
- Notice to Proposers - Industry Review #2 (Posted 3/27/25)
- P041165_Non-Confidential Questions and Answers_R1 (Posted 3/26/25)
- P041165_Request for Proposals for Industry Review #1 (Posted 3/19/25)
Notice to Proposers
Attachment B - Supplemental Project Design Criteria
Construction
- Minimum SOV Items - Bridge (Posted 3/19/25)
Environmental
- P041165_S31 PCE Signed 03-19-25 (Posted 3/19/25)
- P041165 S-42-31 Re-eval PCE Signed 03-25-25 (Posted 3/31/25)
Geotechnical
- Geotechnical Subsurface Data Report (Posted 3/19/25)
- Field Testing Data Files - Terracon (Posted 3/19/25)
- Field Testing Data Files - F&ME (Posted 3/19/25)
Hazardous Materials
- Asbestos and Lead-Based Paint Testing Report (Posted 3/19/25)
Hydro
- Toe-Ditch-Detail (Posted 3/19/25)
- SWPPP-Checklist (Posted 3/19/25)
Roadway
- S-42-31_Roadway Typical Section (Posted 4/4/25)
- Non-Mow Strip Guardrail Details (Posted 3/19/25)
Structures
- Acceptable Polymer Slurry Systems (Posted 3/19/25)
Traffic
- S-31 Cannons Campground Detour 3-5-2025 (Posted 3/19/25)
Project Information Package
Construction
- Complete-List-of-SOV-Items(Posted 3/19/25)
Geotechnical
- Geotechnical Baseline Report (Posted 3/19/25)
Hydro
- S-42-31_P041165_Hydraulics (Posted 3/19/25)
Roadway
- S-42-31_Conceptual Roadway Plan (Posted 3/19/25)
- S-42-31 Roadway Microstation Files (Posted 3/19/25)
- Potential Nested Guardrail Layout (Posted 3/31/25)
Structures
- Conceptual Bridge Plans (Posted 3/19/25)
- SI&A_S31Peters (Posted 3/19/25)
- BridgePlan DGN files (Posted 3/19/25)
- BridgeRepairPlanSet_S31_NotForConstruction (Posted 3/19/25)
Utilities
- Utility Information for RFP (Posted 3/19/25)
Technical Proposal Distribution/Evaluation Meeting
A S-31 Cannons Campground Emergency Bridge Replacement- Technical Proposal Distribution/Evaluation Meeting will be held Wednesday April 16th, 2025 at 8:00 AM via Microsoft Teams. The following is the Team's login information:
Microsoft Teams Need help?
Meeting ID: 266 850 253 244
Passcode: Bm3qB3Jt
Dial in by phone
+1 803-529-1369,,492026589# United States, Columbia
Phone conference ID: 492 026 589#
For organizers: Meeting options | Reset dial-in PIN
S-31 Cannons Campground Distribution Evaluation Meeting Agenda