Bridge links below display the location in Google Maps.
SCDOT proposes to replace six culverts or pipes in Bamberg, Calhoun, and Orangeburg Counties. This project will include constructing new culverts or bridges and associated road work with an accelerated schedule.
Calhoun County
Request for Proposals
- BP 32_Request for Proposals for Industry Review #1 (Posted 2/13/25)
- BP 32_Contractor Selection Memo (Posted 2/18/25)
- BP 32_Request for Proposals for Industry Review #2 (Posted 2/20/25)
- BP 32_Request for Proposals (with Revisions Highlighted) (Posted 2/27/25)
- BP 32_Request for Proposals (Posted 2/27/25)
- BP 32_Non-Confidential Questions and Answers_R3 Updated (Posted 3/5/25)
- BP 32_Request for Proposals with Addendum #1 (Posted 3/5/25)
- BP 32_Notice to Proposers_A1 (Posted 3/5/25)
- BP 32 Request for Best and Final Offer (Posted 3/14/25)
- BP 32 Request for Best and Final Offer Acknowledgement Form (Posted 3/14/25)
- BP 32 Request for Proposals with Addendum #2 (Posted 3/14/25)
- BP 32_Bid Summary Report (Posted 3/18/25)
Notice to Proposers
Attachment B - Supplemental Project Design Criteria
Environmental
- P044267 S-22 over Caw Caw Swamp PCE (Posted 2/20/25)
- P044268 S-39 over Cooper Swamp PCE (Posted 2/20/25)
- P044269 S-191 over Roberts Swamp PCE (Posted 2/20/25)
- P044315 S-458 over Indian Camp Branch PCE (Posted 2/20/25)
- P044270 S-634 over Cooper Swamp PCE (Posted 2/20/25)
- P044271 S-1210 over Tampa Creek PCE (Posted 2/20/25)
- CLRB P32 NW 3 Files (Posted 2/20/25)
Construction
Hydro
- Toe-Ditch-Detail (Posted 2/13/25)
- SWPPP-Checklist (Posted 2/13/25)
Geotechnical
- Geotechnical Subsurface Data Reports and Field Testing Data Files (Posted 2/18/25)
Right of Way
Roadway
- Package 32 Roadway Typical Sections (Posted 2/13/25)
- R1_Package 32 Traffic Projections (Posted 3/4/25)
- Non-Mow Strip Guardrail Details (Posted 3/4/25)
Structures
- R1_Revisions to SCDOT Seismic Design Specifications for Highway Bridges (Posted 2/19/25)
- Revisions to SCDOT Seismic Design Specifications for Highway Bridges (Posted 2/13/25)
- Design Criteria for Box Culverts (Posted 2/13/25)
- Roadway Structure Plan Preparation Requirements (Posted 2/13/25)
- Spray-Applied Bridge Deck Waterproofing Systems (Posted 2/13/25)
Survey
- S-9-22 Survey (Posted 2/19/25)
- S-38-39 Survey (Posted 2/20/25)
- S-38-1210 Survey (Posted 2/24/25)
- S-38-191 Survey (Posted 2/25/25)
- S-38-634 Survey (Posted 2/27/25)
- S-5-458 Survey (Posted 2/27/25)
Traffic
- Package 32 Detour Routes (Posted 2/13/25)
Technical Proposal Distribution/Evaluation Meeting
A Bridge Package 32 Design-Build Project Technical Proposal Distribution/Evaluation Meeting will be held March 12, 2025 at 8:30 AM via Microsoft Teams.
The following is the Team's login information:
Microsoft Teams Need help?
Meeting ID: 237 132 552 001
Passcode: FM2pG2TG
Dial in by phone
+1 803-529-1369,,312391320# United States, Columbia
Phone conference ID: 312 391 320#
Technical Proposal Distribution/Evaluation Meeting
A Bridge Package 32 Design-Build Project Technical Proposal Distribution/Evaluation Meeting will be held March 18, 2025 at 8:00 AM via Microsoft Teams.
The following is the Team's login information:
Microsoft Teams Need help?
Meeting ID: 242 045 726 933
Passcode: Kv7Fs6JW
Dial in by phone
+1 803-529-1369,,519238705# United States, Columbia
Phone conference ID: 519 238 705#