The South Carolina Department of Transportation proposes to replace the existing quad barrel eight foot by ten foot bridge-sized culvert at Rocky Creek with a new bridge along Interstate 85 in Greenville County. The culvert does not have sufficient hydraulic capacity and overtopping of the interstate during flood events has occurred. In addition, the bridge will include the auxiliary lanes for the Pelham Road interchange and width for the future fourth lane in each direction along I-85.
Request for Proposals
Notice of Award
(03/02/20)
Bid Summary Report
(01/29/20)
Request for Proposals - Addendum 4
(11/25/19)
Notice to Proposers - Addendum 4
(11/25/19)
Request for Proposals - Addendum 3
(11/07/19)
Notice to Proposers - Addendum 3
(11/07/19)
Request for Proposals - Addendum 2
(10/08/19)
Notice to Proposers - Addendum 2
(10/08/19)
Request for Proposals - Addendum 1
(09/10/19)
Notice to Proposers - Addendum 1
(09/10/19)
Request for Proposals (Final with Revisions Highlighted)
(07/22/19)
Request for Proposals (Final without Revisions Highlighted)
(07/22/19)
RFP for Industry Review
(05/21/19)
Request for Qualifications
Short-listed Design-Build Teams
(05/16/19)
Request for Qualifications
(03/04/19)
SOQ Submitters List
(04/03/19)
Notice to Potential Proposers
SCBO Advertisement
(02/5/19)
I-85 over Rocky Creek Early Coordination Meeting Presentation
(02/26/19)
Attachment B - Supplemental Project Design Criteria
Environmental
- Approved I85_385 Permit 2012-00588 (05/22/19)
- Original I85 EA 20120518 (05/22/19)
- Approved I85_385 ReEval_11-13-13 (05/22/19)
- Approved I85_385 ReEval_8-4-15 (05/22/2019)
- Approved I85_385 Re-Eval_12-4-15 (05/22/19)
- Approved I85_385 FONSI (05/22/2019)
- Approved I85_385 Rocky Creek ReEval_4-3-19 (05/22/19)
Hydrology
- Toe Ditch Detail (05/21/19)
- SWPPP Checklist (05/21/19)
- Abutment and Pier Setbacks (05/21/19)
Roadway
- Fence_Locations (05/21/19)
Structures
- Rigid_Barrier_Adjacent_to_Wall (05/21/19)
- Revisions to the SCDOT Bridge Design Manual (Reinforcing) (05/21/19)
- Revisions to the SCDOT Bridge Design Manual (LRFD 8th Edition) (05/21/19)
- Revisions to SCDOT Seismic Design Specifications for Highway Bridges (05/21/19)
- Requirements for Seismic Design Summary Reports (05/21/19)
- R1_MASH Bridge Barrier Details (11/07/19)
- SCDOT_Bridge Load Rating Guidance Document_Final_Highlighted_20190405 (05/21/19)
Traffic
Project Information Package
Environmental
- Credit_Confirmation_Letter (05/21/19)
- R1 Rocky Creek Stream Mitigation Credit Worksheet (11/07/19)
Geotechnical
- Revised Geotechnical Base Line Report (08/30/19)
- Boring Logs (06/06/19)
- Raw CPT Data (08/30/19)
Hydrology
- I-85 Over Rocky Creek Hydro Report (03/04/19)
- Rocky Creek I-85 Annotated Firm Map (03/04/19)
- Rocky Creek I-85 Topographic Work Map (03/04/19)
- SCDHEC Permitting Time Chart (05/21/19)
- I85_I385 Pipe Inspection Data (06/24/19)
- CLOMR Rocky Creek I85 final (07/01/19)
- Rocky Creek Report_20190628 (07/01/19)
- Rocky Creek Hydro Models (07/01/19)
- Rocky Creek GIS Files (09/04/19)
Roadway
- Conceptual Road Plans (07/10/19)
- I85_385 RFC Plans (06/24/19)
- I85_385 Design Files (06/24/19)
- I85 Rocky Creek_SB Cross Sections_387-406 (07/10/19)
- Conceptual Roadway Plans .dgns (07/26/19)
Structures
- Structure Inventory and Appraisal Report (03/04/19)
- Conceptual Bridge Plans (05/21/19)
- Conceptual Bridge Plans.zip (06/24/19)
Surveys
- I-85 over Rocky Creek Survey Files (06/24/19)
- Cross Slope Correction Survey Data I85_53.2-56.1_SB (06/24/19)
- I85_I385 Survey Files (07/24/19)
Traffic
- I-85 Rocky Creek Temporary Signing (06/25/19)
- I-85 Spartanburg Traffic Counts Base Year 2022 (06/27/19)
- Rocky Creek Sign Lighting plans (08/07/19)
- Rocky Creek Sign plans (08/07/19)
Utilities
- Draft Utility Conceptual Report (03/04/19)
- SCDOT Conflict I-85 Map (03/04/19)
- Utility Plan Sheets (03/04/19)
- ROCKY CREEK ITS FIBER PLAN VEIW (07/10/19)
- ROCKY CREEK_EX_ITS_PROF (07/10/19)
- ROCKY CREEK ITS FIBER (07/10/19)
- ITS Fiber Bore Locations (07/10/19)
- I-85 over Rocky Creek Preliminary Utility Report (07/26/19)
- Utilities Microstation File dgn (09/19/19)
Proposal Evaluation Committee Meeting
An I-85 over Rocky Creek Evaluation Committee Meeting will be held on January 14, 2020 at 10:00 AM at SCDOT Headquarters in Room 303A.
Evaluation Committee Meeting
(01/10/20)
An I-85 over Rocky Creek Evaluation Committee Meeting will be held on December 3, 2019 at 9:00 AM at SCDOT Headquarters in Room 421.
Committee Meeting
(12/02/19)
Statement of Qualifications Evaluation Team Meeting
An I-85 over Rocky Creek Bridge Replacement SOQ Evaluation Committee Meeting will be held on May 7, 2019 at 8:00 am at SCDOT Headquarters in Room G-22.
Evaluation Committee Meeting
(05/06/19)
Notice to Parties Interested in Providing Design Build Services
Qualifications and/or proposals from any contracting entity must utilize the new ProjectWise electronic proposal submission system. The following information describes the process that teams should follow to access the SCDOT ProjectWise environment for proposal submissions and their respective project data using the new system. Please use this ProjectWise Account Setup & Requirements link to set up accounts.