The South Carolina Department of Transportation (SCDOT) proposes to replace the S-51 (E. Academy St.) Bridge over an Unnamed Stream in Dillon County, the S-33 (Davids Pond Rd.) Bridge over Naked Creek in Marlboro County, and the S-400 (Level Green Church Rd.) Bridge over Herndon Branch in Marlboro County. This design-build project bridge package consists of all work necessary to remove the existing bridges and to construct new bridges, including the associated roadway and drainage work necessary to tie the new approaches to the existing roadway
Request for Proposals
Notice of Award
(1/14/19)
Bid Summary Report
(1/14/19)
Request for Proposals- Addendum 1
(12/18/18)
Notice to Proposers - Addendum 1
(12/18/18)
Request for Proposals (Final without Revisions Highlighted)
(12/12/18)
Request for Proposals (Final with Revisions Highlighted)
(12/12/18)
Request for Proposals (Industry Review)
(11/30/18)
Attachment B - Supplemental Project Design Criteria
Environmental
- P038248 PCE S-51 (12/10/18)
- P038249 CE S-33 (11/30/18)
- P038250 PCE S-400 (11/30/18)
Geotechnical
- Figure - Front Slope Definition (11/30/18)
Hydraulics
- Toe Ditch Detail (11/30/18)
- Plan review checklist (11/30/18)
- Pier and Abutment Setback Detail (11/30/18)
Roadway
- Drawing 805-710-SP (11/30/18)
Project Information Package
FEMA Code and Standard Documentation
- Memorandum and Attachments (11/16/18)
Geotechnical
- S-17-51 Geotechnical Data Report (11/30/18)
- S-17-51 Field Testing Data (11/30/18)
- S-35-33 Geotechnical Subsurface Data Report (11/30/18)
- S-35-33 Boring Logs (11/30/18)
- S-35-400 Geotechnical Data Report (11/30/18)
- S-35-400 Boring Logs (11/30/18)
Hydrology
- SCDHEC Permitting Time (11/30/18)
Roadway
- S-33 Survey (11/30/18)
- S-51 Survey (11/30/18)
- S-400 Survey (11/30/18)
Structures
- S-33 SIA (11/30/18)
Notice to Parties Interested in Providing Design Build Services
Qualifications and/or proposals from any contracting entity must utilize the new ProjectWise electronic proposal submission system. The following information describes the process that teams should follow to access the SCDOT ProjectWise environment for proposal submissions and their respective project data using the new system. Please use this ProjectWise Account Setup & Requirements link to set up accounts.