This design-build project is for the replacement of three (3) bridges over Great Pee Dee River, Overflow, and Yauhannah Lake in Georgetown and Horry Counties. Information documents for contractors can be found below.
Bid Summary
Request for Proposals
Addendum #4
Addendum #3
Additional Attachment B Information
Addendum #2
Additional Attachment B Information
Addendum #1
Request for Proposals Final
Additional Attachment B Information
Request for Proposals (Industry Review)
Please see ProjectWise for Attachment B located at: Design Build ShareAttachment B
Request for Qualifications
Related Documents and Links
Information Package (Posted 2/28/14)
- Structure Inventory and Appraisal sheets
- Active Fee Appraiser Listing
- Active Fee Reviewer Listing
- On-Call Right of Way Consultant List
- Environmental Assessment
- FONSI
- Public Hearing Displays
- Handout
- Public Hearing Presentation
- Public Hearing Certification
- Natural Resources Report
- JD Request Package
- Preliminary Geotechnical Report
- Noise Report
- HAZMAT Reports
- Cultural Resources Survey
- Cultural Resources Addendum
- Summary of Hydraulic Study
- Conceptual Alignment Report
- Bridge Concept Reports
- Traffic Analysis Report
- Shaft Load Test
- Preliminary Pavement
- Exiting Bridge Plans
Proposal Evaluation Team Meeting
A US 701 Committee meeting to evaluate the RFP responses will be held on December 16, 2014, at 9:00 AM in Conference Room 303A at SCDOT Headquarters.
Evaluation Team Meeting Agenda
A US 701 Committee meeting to distribute the RFP responses will be held on December 4, 2014, at 2:00 PM in Conference Room 303A at SCDOT Headquarters.
Evaluation Team Meeting Agenda
US 701 Proposal Evaluation Team meeting will be held on April 29-30, 2014 at 8:00 AM in Conference Room 303A at SCDOT Headquarters.
Posted 4/21/2014
Evaluation Team Meeting Agenda
Notice to Parties Interested in Providing Design Build Services
Qualifications and/or proposals from any contracting entity must utilize the new ProjectWise electronic proposal submission system. The following information describes the process that teams should follow to access the SCDOT ProjectWise environment for proposal submissions and their respective project data using the new system. Please use this ProjectWise Account Setup & Requirements link to set up accounts.