I-77 Widening & Rehabilitation

This design-build project is for the widening of I-77 with an additional lane in each direction. The widening will begin between SC 12 (Percival Road) and I-20 and terminate at the Killian Road interchange. All of the mainline bridges will be widened including I-77 northbound/southbound bridges over I-20 mainline and CD, I-77 northbound/southbound bridges over I-20 westbound ramp to I-77 southbound, I-77 northbound/southbound bridges over Windsor Lake Boulevard, I-77 northbound/southbound bridges over Windsor Lake and Jackson Creek, and I-77 northbound/southbound bridges over Edgewater Drive and Little Jackson Creek. The project also includes the pavement rehabilitation and cross slope verification/correction of the existing lanes of I-77 from just north of US 1 (MM 17.47 +/-) to Killian Road (MM 22 +/-) and southbound lanes from Killian Road to Blythewood Road (MM 27 +/-). The pavement for the project will consist of both concrete and asphalt. Information documents for contractors can be found below.



Project Information Package (Attachment B)

Roadway

  1. Double Profiles (05/27/15)
  2. Lidar (05/27/15)
  3. Microstation files (05/27/15)
  4. P27002a (05/27/15)
  5. P027002 PDFs (05/27/15)
  6. P027002_I77_LiDAR_2014 (05/27/15)
  7. P027002_I77_Plan Sheets (05/27/15)
  8. Microstation 2 (06/09/15)
  9. 805-710.SP (07/24/15)
  10. Safety Clearing (9/14/15)

Traffic

  1. I-77 Signing Plan (05/27/15)
  2. Overhead.zip (08/3/15)
  3. M1025.zip (08/3/15)
  4. Ground Mounts I Beams.zip (08/3/15)

Geotechnical

  1. Geotechnical Basline Report (05/27/15)
  2. I-77 Boring Logs (07/1/15)

Environmental

  1. I-77 Widening CE-C Binder (05/27/15)
  2. Approved_CE-C (06/26/15)
  3. Approved JD (09/14/15)

Hazardous Materials

  1. Asbestos & Lead Based Paint Reports (05/27/15)

Railroad

  1. CSXT (05/27/15)
  2. NS.zip (07/1/15)
  3. NS_2.zip (09/14/15)

Utilities

  1. Preliminary Utility Report (05/27/15)
  2. SCDOT SUE Info (09/14/15)
  3. SCDOT SUE Map (09/14/15)
  4. Utility Coord Info (09/24/15)

HDR-Preliminary Design Information

  1. Envir_CE (06/10/15)
  2. Envir_JD (06/10/15)
  3. Envir_Noise (06/10/15)
  4. CAD Env (07/1/15)

Forms

  1. Pile_Driving_Form (06/26/15)
  2. Drilled_Shaft_Forms (06/26/15)

Proposal Evaluation Team Meeting

I-77 Widening and Rehabilitation Proposal Evaluation Team meeting will be held on October 1, 2015 at 8:45 AM in Conference Room 421 at SCDOT Headquarters.
Evaluation Team Meeting Agenda (PDF 41.1 Kb) Posted 9/24/2015

I-77 Widening and Rehabilitation Proposal Evaluation Team meeting will be held on January 5, 2015 at 9:00 AM in Conference Room 303A at SCDOT Headquarters.
Evaluation Team Meeting Agenda (PDF 36 Kb) Posted 11/24/2014

Notice to Parties Interested in Providing Design Build Services

Qualifications and/or proposals from any contracting entity must utilize the new ProjectWise electronic proposal submission system. The following information describes the process that teams should follow to access the SCDOT ProjectWise environment for proposal submissions and their respective project data using the new system. Please use this ProjectWise Account Setup & Requirements link to set up accounts.