I-20 Widening (Mile Markers 49-60)
This design-build project is for the widening of I-20 with an additional lane in each direction. The widening will begin just east of US 378 where the roadway transitions from a six lane section to a four lane section and terminate west of the Longs Pond Road interchange near mile marker 49. The I-20 eastbound and westbound bridges over Norfolk Southern Railroad will be replaced. The pavement for the project will consist of both concrete and asphalt and the existing concrete pavement section will require reconstruction. Information documents for contractors can be found below.
Request for Proposals
Notice of Award
(11/05/19)
Bid Summary Report
(11/05/19)
Request for Proposals - Final with Addendum 1
(12/18/15)
Notice to Proposers - Addendum 1
(1/11/16)
Request for Proposals (Final)
(10/27/15)
Request for Proposals (Industry Review)
(9/15/15)
Request for Qualifications
Request for Qualifications
(1/29/15)
SOQ Submitters List
(6/30/15)
Short-listed Design Build Teams
(7/17/15)
Attachment B - Supplemental Project Design Criteria
Environmental
- Traffic Noise Analysis Report (9/15/15)
- I-20 Widening CE-C (9/15/2015)
- JD Files (10/15/2015)
- JD Images (10/23/2015)
Forms
- Drilled Shaft Forms (9/15/2015)
- Pile and Driving Equipment Data Form (9/15/2015)
- Contractor Certification Form (9/15/2015)
Hazardous Materials
- I-20 Asbestos Inspection Report (9/15/2015)
- I-20 Lead Paint Inspection Report (9/15/2015)
Hydraulics
- I-20 DB Prep Drainage Summary Spreadsheets (9/15/2015)
- Standard Drawing for Catch Basin Type 25 (9/15/2015)
Pavement
- I-20 S-204 Interchange (9/15/2015)
Railroad
- NS Response (9/15/2015)
Right of Way
- On Call Right of Way Consultant List (9/15/2015)
- Active Fee Appraisers and Reviewers Lists (9/15/2015)
Roadway
- Drawing 805-710-SP (9/15/2015)
- I-20 Design Exception (12/18/2015)
Traffic
- I-20 Conceptual Signing (9/15/2015)
- Conceptual Signing Files (10/01/2015)
Attachment C - Project Information Package
Environmental
- Noise Wall Files (10/15/2015)
- Public Meeting Files (10/23/2015)
Geotechnical
- I-20 Geotechnical Base Line Report (9/15/2015)
- I-20 Widening gINT file (9/15/2015)
Hydraulics
- I-20 DB Prep Stormwater Management Design Report (9/15/2015)
- I-20 DB Prep Survey Report of Ground Control & Aerial Targets (9/15/2015)
- I-20 DB Prep VPI Report (9/15/2015)
- Drainage Files (10/23/2015)
- I-20 Video Inspection Report (10/23/2015)
Pavement
- Traffic Data (9/15/2015)
- US 1 Interchange Ramps (9/15/2015)
- SC 6 Interchange Ramps (9/15/2015)
- I-20 DB Lexington FWD (10/23/2015)
Roadway
- PDF Files (9/15/2015)
- Microstation Files (9/15/2015)
- Additional Reference Roadway Files (9/28/2015)
- Survey Scope of Services - I-20 I-77 PSG (10/23/2015)
- SCDOT Certification (10/23/2015)
Structures
- SI&A Report - Mainline Bridges (1/29/2015)
- SI&A Report - Overpass Bridge (1/29/2015)
- Existing Bridge Plans (9/15/2015)
- Bridge Inspection Reports (9/15/2015)
Traffic
- I-20 Preliminary ITS Plans (10/27/15)
Utilities
- Preliminary Utility Coordination Report (9/15/2015)
- Utility Files (10/23/2015)
Proposal Evaluation Team Meeting
I-20 Widening Project Evaluation Team Meeting will be held on January 19, 2015 at 1:00 pm at SCDOT Headquarters in Room 421.
I-20 Evaluation Team Meeting Agenda - Proposal Distribution Posted
(9/15/15)
I-20 Widening Proposal Evaluation Team meeting will be held on January 27, 2015 at 9:00 AM at SCDOT Headquarters in Room 421.
I-20 Evaluation Team Meeting Agenda - Proposal Evaluation
(9/15/15)
Statement of Qualifications Evaluation Team Meetings
I-20 Widening Project Evaluation Team Meeting will be held on June 30, 2015 at 10:00 am at SCDOT Headquarters.
I-20 Widening MM 49-60 Committee meeting Agenda
(6/29/15)
I-20 Widening Proposal Evaluation Team meeting will be held on July 13, 2015 at 9:00 AM in Conference Room 424 at SCDOT Headquarters.
Evaluation Team Meeting Agenda
(6/15/15)
Notice to Parties Interested in Providing Design Build Services
Qualifications and/or proposals from any contracting entity must utilize the new ProjectWise electronic proposal submission system. The following information describes the process that teams should follow to access the SCDOT ProjectWise environment for proposal submissions and their respective project data using the new system. Please use this ProjectWise Account Setup & Requirements link to set up accounts.