Closed and Load Restricted Bridge Package 2020-1

The project includes replacing sixteen bridges across District 2 in Abbeville, Greenwood, Laurens, McCormick, Newberry, and Saluda Counties. The bridges are:

Abbeville

  • S-218 over Branch of Penny Creek
  • S-96 over Shanklin Creek

Greenwood

  • S-95 over Camp Creek

Laurens

  • S-110 over North Lick Creek
  • S-34 over Millers Fork Creek
  • S-340 over Mountain Creek

McCormick

  • S-34 over Rocky Creek
  • S-52 over Rocky Creek

Newberry

  • S-272 over Second Creek
  • S-272 over Tributary to Second Creek
  • S-277 over Beaver Dam Creek
  • S-342 over Big Beaver Dam Creek

Saluda

  • S-211 over Richland Creek
  • S-281 over Tributary to Lake Murray
  • S-37 over Rocky Creek
  • S-78 over Persimmon Creek

Attachment B - Supplemental Project Design Criteria

Environmental

  1. R1_CLRB 2020-1 PCEs (12/06/19)

Hazardous Materials

  1. R1_Asbestos and Lead-Based Paint Reports (12/06/19)

Hydrology

  1. Toe Ditch Detail (09/30/19)
  2. SWPPP Checklist (09/30/19)
  3. R1_Abutment Pier Setback (02/11/20)
  4. R1_Span Lengths (12/06/19)

Structures

  1. Revisions to the SCDOT Bridge Design Manual (Reinforcing) (09/30/19)
  2. Revisions to the SCDOT Bridge Design Manual (LRFD 8th Edition) (09/30/19)
  3. MASH Bridge Barrier Details (12/06/19)
  4. SCDOT Bridge Load Rating Guidance Document (09/30/19)
  5. Acceptable Polymer Slurry Systems (09/30/19)
  6. Draft Standard 805-325-30 (02/11/20)



Traffic

  1. R1_ Approved Bridge Detour Maps (12/06/19)

Project Information Package

Hydrology

  1. SCDHEC Permitting Time Chart (9/30/19)

Proposal Evaluation Committee Meeting

A Closed Load Restricted Bridge Package Technical May 26, 2020 at 9:00 AM via WebEx.

The following is the WebEx login information:

Tuesday, May 26, 2020 9:00 am
Meeting number (access code): 476 533 087
Meeting password: peCUyqP9t56
https://scdot.webex.com/scdot/j.php?MTID=m018f810c0f6d181e4c9b9eda98f725fd

Join by phone
+1-415-655-0001 US Toll
Access code: 476 533 087

CLRB Technical Proposal Meeting Agenda

Proposal Evaluation Committee Meeting

A Closed Load Restricted Bridge Package Technical Proposal Distribution Team Meeting will be held on April 10, 2020 at 10:00 AM via WebEx.

The following is the WebEx login information:

Friday, April 10, 2020 10:00 am
Meeting number: 471 998 222
Password: tvVnmyDv667
https://scdot.webex.com/scdot/j.php?MTID=m7d4d9397fc90ddac3d502b6bb92cb492

Join by phone
+1-415-655-0001 US Toll
Access code: 471 998 222

Technical Proposal Distribution Team Meeting Agenda


Notice to Parties Interested in Providing Design Build Services

Qualifications and/or proposals from any contracting entity must utilize the new ProjectWise electronic proposal submission system. The following information describes the process that teams should follow to access the SCDOT ProjectWise environment for proposal submissions and their respective project data using the new system. Please use this ProjectWise Account Setup & Requirements link to set up accounts.