Bridge Package 18

SCDOT proposes to repair and/or replace two load restricted secondary bridges in Horry County. The project will include replacing the existing S-31 bridge and repairing the S-154 bridge and also include any associated roadway work.

Google Maps icon

Bridge links below display the location in Google Maps.

Request for Qualifications

Notice to Proposers

Attachment B - Supplemental Project Design Criteria

Hazardous Materials

  1. Asbestos and Lead-Based Paint Reports (5/22/24)

Hydro

  1. Toe-Ditch-Detail (5/22/24)
  2. SWPPP-Checklist (5/22/24)

Survey

  1. Package 18 Surveys (5/22/24)

Project Information Package

Geotechnical

  1. S-31 Geotechnical Baseline Report (5/22/24)

Hydrology

  1. Memos and Models (5/22/24)

Statement of Qualification Distribution Meeting

A Bridge Package 18 Design-Build Project Statement of Qualification Distribution Meeting will be held on June 24, 2024 at 11:30 am via Microsoft Teams.

The following is the WebEx login information:

Microsoft Teams Meeting
Join on your computer or mobile app
Click here to Join the Meeting

Meeting ID: 222 521 319 83
Passcode: Gq5CyB

Or call in (audio only)
+1 803-529-1369,,724943560# United States, Columbia
Phone Conference ID: 724 943 560#

Find a local number | Reset PIN| Learn More |Meeting options

Bridge Package 18 SOQ Distribution Meeting Agenda