The Project consists of all work necessary, within a 1.5 mile section of US 301, to remove the remainder of four existing bridges and to construct new bridges, including the associated roadway and drainage work necessary to tie the new approaches to the existing roadways. The project also includes roadway and drainage work between the four bridges within the entire 1.5 mile corridor. As the result of flooding, the existing structures were damaged beyond repair. All locations are along US 301 over the Black River Swamp.
Request for Proposals
Request for Proposals
(2/1/16)
Request for Proposals (Industry Review)
(1/22/16)
Attachment B - Supplemental Project Design Criteria
Enviromental
- US 301 Black River Swamp CE-B (PDF 564 Kb) (posted 1/22/16)
Forms
- Drilled Shaft Forms (1/22/16)
- Pile & Driving Equipment Data Form (1/22/16)
- Contractor Certification Form (1/22/16)
Roadway
- Drawing 805-710-SP (1/22/16)
Attachment C - Project Information Package
Existing Plans
- 14.297 As Built Plans (1/22/16)
- 14.297 As Let Plans (1/22/16)
- 14.361 As Built Plans (1/22/16)
- 14.361 As Let Plans (1/22/16)
Geotechnical
- US 301 Geotech - PGSDR (1/22/16)
- US 301 Field Testing Data (1/22/16)
- US 301 - Percent Compaction by Nuclear Gauge (2/1/16)
Right-Of-Way
- Active Fee Reviewer List (1/22/16)
- Active Fee Appraiser List (1/22/16)
- Approved Consultant Firms (1/22/16)
- US 301 Deed 1 (1/22/16)
- US 301 Deed 2 (1/22/16)
- US 301 Deed 3 (1/22/16)
Roadway
- Survey (1/22/16)
Structures
- SI&A Reports (1/22/16)
- Inspection Reports (2/1/16)
Traffic
- US 301 Detour Route (1/22/16)
- US 301 Detour Quantities (1/22/16)
Utilities
Evaluation Team Meetings
An Evaluation Team meeting will be held on February 4, 2016 at 9:00 AM at SCDOT Headquarters in Room 421.
Evaluation Team Meeting Agenda - Proposal Distribution
(1/22/16)
An Evaluation Team meeting will be held on February 4, 2016 at 10:00 PM at SCDOT Headquarters in Room 421.
Evaluation Team Meeting Agenda - Proposal Evaluation
(1/22/16)
Notice to Parties Interested in Providing Design Build Services
Qualifications and/or proposals from any contracting entity must utilize the new ProjectWise electronic proposal submission system. The following information describes the process that teams should follow to access the SCDOT ProjectWise environment for proposal submissions and their respective project data using the new system. Please use this ProjectWise Account Setup & Requirements link to set up accounts.