In order to provide direct access to the proposed Volvo Manufacturing Facility, SCDOT plans to construct a new three-leg directional interchange along I-26 in Berkeley County, South Carolina. The proposed interchange will provide access from I-26 to the new Volvo Boulevard which leads to Camp Hall Commerce Park and the Volvo Manufacturing Facility. The new interchange will be located along I-26 at approximate mile marker 189 which is approximately two (2) miles east of SC 27/Ridgeville Road (exit 187) and approximately five (5) miles west of Jedburg Road (exit 194). The proposed interchange includes both at-grade and flyover ramps.
SCDOT expects to secure a design-build contractor to perform the work. Project related information is included below for potential contractors.
Request for Proposals
Bid Summary Report
(02/6/19)
Notice of Award 12-21-2016
(Posted 2/6/19)
Request to Award
(Posted 12/22/16)
Notice to Proposers - Addendum 4
(Posted 11/23/16)
Request for Proposals - Final with Addendum 4
(Posted 11/23/16)
Notice to Proposers - Addendum 3
(Posted 11/09/16)
Request for Proposals - Final with Addendum 3
(Posted 11/09/16)
Notice to Proposers - Addendum 2
(Posted 10/27/16)
Request for Proposals - Final with Addendum 2
(Posted 10/27/16)
Request for Proposals - Final with Addendum 1
(Posted 09/13/16)
Notice to Proposers - Addendum 1
(Posted 09/13/16)
Request for Proposals (Industry Review)
(Posted 07/01/16)
Request for Proposals (Final with Revision Highlighted)
(Posted 08/12/16)
Request for Proposals (Final without Revisions Highlighted)
(Posted 08/12/16)
Request for Qualifications
Short-listed Design-Build Teams
(Posted 06/15/16)
SOQ Submitters List
(Posted 06/03/16)
Notice to Proposers - Addendum 1
(Posted 05/19/16)
Request for Qualifications Addendum 1
(Posted 05/13/16)
Request for Qualifications
(Posted 04/29/16)
Notice to Potential Proposers
Pre-RFQ Meeting Notice Posted 2/29/16
Attachment B
Environmental
- DHEC Coastal Zone Certification (Posted 05/5/16)
- USACE EA FONSI Permit Documents (Posted 07/01/16)
- USACE Final Permit (Posted 05/5/16)
- USACE Permit Modification (Posted 05/20/16)
- FHWA FONSI & IJR Approval (Posted 08/12/16)
- Permit Modification #4 Package (Moved 11/09/16)
Forms
- Drilled Shaft Forms (Posted 07/01/16)
- Pile and Driving Equipment Data Form (Posted 07/01/16)
- Contractor Certification Form (Posted 07/01/16)
Roadway
- Drawing 805-710 SP (Posted 07/01/16)
- Revised Interchange Typical Sections (Updated 10/27/16)
- I-26 Future Typical Section (Posted 08/12/16)
Structures
- Horizontal Clearance Requirements under New Overpasses (Posted 07/01/16)
- Rigid Barrier Adjacent to Wall (Posted 07/01/16)
Traffic
- Conceptual Signing Plan (Posted 07/06/16)
- Interchange Justification Report (Posted 08/12/16)
- Supplemental Traffic Analysis (Posted 09/02/16)
- Supplemental Weave Analysis (Posted 09/02/16)
Attachment C
Environmental
- Permit Modification #4 Package (Moved 11/09/16)
Geotechnical
- Volvo Geotechnical Base Line Report (Posted 05/5/16)
- Volvo Site-Specific Seismic Response Analysis Report (Posted 07/01/16)
- Volvo Field Testing Data (Posted 07/01/16)
Hydraulics
- Draft Hydro Report (Posted 07/01/16)
- Draft Hydro Design Data (Posted 07/01/16)
Miscellaneous
- Master Plan Draft (Posted 04/29/16)
- Volvo Car Drive Plans 3-16-16 (Posted 07/01/16)
- Volvo Car Drive Specs 3-16-16 (Posted 07/01/16)
- Updated Volvo Cars Drive Plans (Sta 0+00 to 30+00) (Posted 10/27/16)
- Volvo Cars Drive DGN Files (Posted 10/27/16)
- Volvo Car Drive Cross Sections (Posted 11/09/16)
- Volvo Car Drive Culvert Shop Drawings (Posted 11/09/16)
Pavement
- Traffic Data for Pavement Loading (Posted 07/01/16)
Roadway
- Old Plans (Posted 07/01/16)
- Roadway Files (Posted 07/01/16)
- Updated Roadway Files (Posted 09/13/16)
- Roadway Plans PDF (Updated 09/13/16)
- Cross Sections PDF (Updated 09/13/16)
Structures
- DGN Files for Conceptual Bridge Plans (Updated 09/13/16)
- PDF File of Conceptual Bridge Plans (Updated 09/13/16)
Survey
- I-26 LiDAR FOCUS Report (Posted 07/01/16)
- Quantum I-26 SC LiDAR Control Report (Posted 07/01/16)
- Survey and Mapping Report Certification (Posted 07/01/16)
- ASCii (Posted 07/01/16)
- Imagery (Posted 07/01/16)
- LAS (Posted 07/01/16)
- LAS Bare Earth (Posted 07/01/16)
- I-26 Planimetrics (Posted 07/01/16)
- 25644 Wetland Base (Posted 07/01/16)
- DTM (Posted 07/01/16)
Traffic
- Interchange Justification Report (IJR) - Draft Final (Posted 07/01/16)
- IJR Electronic Files (Posted 07/01/16)
Utility
- SC811 Contacts (Posted 07/01/16)
- Preliminary Utility Report (Posted 07/01/16)
- Proposed Utility Design (Posted 09/13/16)
- BCWS Schedule (Posted 09/13/16)
Proposal Evaluation Team Meeting
An I-26 Volvo Interchange Project Evaluation Committee meeting will be held on December 14th, 2016 at 8:00 am at SCDOT Headquarters in Room 424.
I-26 Volvo Technical Proposal Evaluation Committee Meeting
(Posted 12/12/16)
An I-26 Volvo Interchange Committee meeting will be held on December 12th, 2016 at 8:30 am at SCDOT Headquarters in Room 421.
I-26 Volvo Evaluation Committee Meeting Agenda - Proposal Distribution
(posted 12/08/16)
Notice to Parties Interested in Providing Design Build Services
Qualifications and/or proposals from any contracting entity must utilize the new ProjectWise electronic proposal submission system. The following information describes the process that teams should follow to access the SCDOT ProjectWise environment for proposal submissions and their respective project data using the new system. Please use this ProjectWise Account Setup & Requirements link to set up accounts.