I-85 Reconstruction and Widening MM 77-98

The SCDOT proposes improvements to an approximately 21-mile long section of the I-85 corridor designed to rehabilitate asphalt, increase capacity, and upgrade interchanges and overpass bridges to meet state and federal design requirements. SCDOT intends to rehabilitate the existing 6 lanes from pavement joint near MM 76.4 to MM 80, then widen I-85 from four to six lanes beginning at MM 80 in Spartanburg County and ending within 0.25 mile of the Broad River Bridge, which is approximately 1.5 miles north of Exit 96 - Shelby Highway (SC 18) in Cherokee County. Along the approximately 21-mile project area, interchanges at Exit 83 - Battleground Road (SC 110), Exit 87 - Green River Road (S-39), Exit 95 - Pleasant School Road (S-82), and Exit 96 - Shelby Highway (SC 18) will be modified to bring them into compliance with state and federal design requirements. A frontage road on the northeast side of Exit 90 - Hyatt Street (SC 105) will be reconfigured to improve traffic flow. The overpass bridges at CSX RR crossing and at Sunny Slope Drive (S-131) will be replaced to provide greater vertical clearance to meet design standards.



Attachment B - Supplemental Project Design Criteria

Pavement

  1. 4C Ramp Pavement Termini Chart (removed 5/25/16)
  2. Revised 4C Ramp Pavement Termini Chart (removed 6/22/16)
  3. Revision 2 4C Ramp Pavement Termini Chart (removed 7/12/16)
  4. Pavement Non-Interstate Traffic and Design Category (removed 7/12/16)
  5. Revised Pavement Non-Interstate Traffic and Design Category (7/12/16)
  6. Revision 3 Ramp Pavement Termini Chart (7/12/16)

Roadway

  1. Drawing 805-710-SP (4/13/16)
  2. Rumble Strip (4/13/16)
  3. Design Exception Maximum Grade (5/25/16)
  4. Design Exception SSD (5/25/16)
  5. Future 8 Lane Typical Sections (removed 6/23/16)
  6. Roundabout Criteria (8/15/16)

Structures

  1. Deck Drainage Modifications (4/13/16)
  2. Deck Repair Details (4/13/16)
  3. Horizontal Clearance Requirements under New Overpasses (4/13/16)
  4. Revised Rigid Barrier Adjacent to Wall (8/15/16)
  5. CSXT Bridge Plans (removed 6/23/16)
  6. CSXT Bridge Specs (removed 6/23/16)
  7. Revised CSXT Bridge Plans (6/23/16)
  8. Revised CSXT Bridge Specs (6/23/16)
  9. CSXT Construction Agreement (6/23/16)

Survey

  1. Survey Control Reports (5/25/16)

Traffic

  1. Signing Plans MM 80-96 (removed 6/23/16)
  2. Signing Plans MM 80-96 Addendum 1 (6/22/16)
  3. Signing Files (4/19/16)
  4. Exit 83 IMR (5/25/16)
  5. Exit 95 IMR (5/25/16)

Attachment C - Project Information Package

Pavement

  1. Pavement Advisory Committee Memo (2/5/16)
  2. Exit 78 (4/13/16)
  3. Exit 80 (4/13/16)
  4. Exit 90 (4/13/16)
  5. Exit 92 (4/13/16)
  6. S-518 (4/13/16)
  7. S-614 (4/13/16)
  8. S-661 (4/13/16)
  9. S-665 (4/13/16)
  10. S-668 (4/13/16)
  11. Smith Road (4/13/16)
  12. Pavement Investigation Summary (4/13/16)

Roadway

  1. 11.347 Existing Plans (1/28/16)
  2. 11.344 Existing Plans (1/28/16)
  3. 42.458 Existing Plans (1/28/16)
  4. 42.453 Existing Plans (1/28/16)
  5. 42.389A Existing Plans (1/28/16)
  6. Design Files Sta. 873+35 - Sta. 1817+57 (removed 07/12/16)
  7. Design Files S-1009 & Conway Black Road (4/13/16)
  8. Design Files Sta. 708+70 - Sta. 873+35 (removed 07/12/16)
  9. Segment A Revised MicroStation Files (removed 07/12/16)
  10. Revised Design Files Sta. 708+70 - Sta. 873+35 (5/25/16)
  11. 843+44.18 to 1185+00.00 Concept Plans PDF (7/12/16)
  12. 1185+00 to 1485+00 Concept Plans PDF (7/12/16)
  13. 1485+00 to 1806+14.82 Concept Plans PDF (7/12/16)
  14. Design Files Sta. 873+35 - Sta. 1817.57 (7/12/16)

Proposal Evaluation Team Meeting

I-85 Widening Project Evaluation Team Meeting will be held on September 8, 2016 at 9:00 am at SCDOT Headquarters in Room 421.
I-85 Evaluation Team Meeting Agenda - Proposal Distribution (8/16/16)

I-85 Widening Project Evaluation Team Meeting will be held on September 26, 2016 at 9:00 am at SCDOT Headquarters in Room 424.
I-85 Evaluation Team Meeting Agenda - Proposal Evaluation (9/21/16)

Statement of Qualifications Evaluation Team Meetings

An Evaluation Committee meeting to distribute the Statements of Qualifications will be held on March 2, 2016, at 2:00 PM in Conference Room 421 at SCDOT Headquarters.
Evaluation Team Meeting (1/28/16)

Notice to Parties Interested in Providing Design Build Services

Qualifications and/or proposals from any contracting entity must utilize the new ProjectWise electronic proposal submission system. The following information describes the process that teams should follow to access the SCDOT ProjectWise environment for proposal submissions and their respective project data using the new system. Please use this ProjectWise Account Setup & Requirements link to set up accounts.