Emergency Bridge Package 4

The Project consists of all work necessary, at four separate locations, to remove the remainder of the existing bridges and to construct new bridges, including the associated roadway and drainage work necessary to tie the new approaches to the existing roadways. As the result of flooding, the existing structures were damaged beyond repair. The four locations are described as follows: S-28-36 (Pine Grove Road) over Twenty-Five Mile Creek in Kershaw County, S-40-69 (Congress Road) over Jumping Run Creek in Richland County, S-40-827 (Rockbridge Road) over Spring Lake in Richland County, and S-45-51 (Battery Park Road) over Black Mingo Creek in Williamsburg County. At both S-28-36 and S-45-51, the necessary work includes repairing roadway embankments, outside of the bridge approaches, that were also damaged during flooding.



Attachment B - Supplemental Project Design Criteria

Environmental

  1. S-69 CE-B (12/4/15)
  2. S-827 CE-B (12/4/15)
  3. S-36 CE-B (12/4/15)
  4. S-51 CE-B (12/4/15)
  5. S-51 CE-B Revised (12/10/15)

Roadway

  1. Drawing 805-710-SP (12/4/15)

Attachment C - Project Information Package

Structures

  1. SI&Reports (12/4/15)

Evaluation Team Meetings

An Evaluation Team meeting will be held on December 15, 2015 at 9:00 AM at SCDOT Headquarters in Room 421.
Evaluation Team Meeting Agenda - Proposal Distribution

An Evaluation Team meeting will be held on December 15, 2015 at 10:00 AM at SCDOT Headquarters in Room 421.
Evaluation Team Meeting Agenda - Proposal Evaluation

Notice to Parties Interested in Providing Design Build Services

Qualifications and/or proposals from any contracting entity must utilize the new ProjectWise electronic proposal submission system. The following information describes the process that teams should follow to access the SCDOT ProjectWise environment for proposal submissions and their respective project data using the new system. Please use this ProjectWise Account Setup & Requirements link to set up accounts.