The Project consists of all work necessary, at four separate locations, to remove the remainder of the existing bridges and to construct new bridges, including the associated roadway and drainage work necessary to tie the new approaches to the existing roadways. As the result of flooding, the existing structures were damaged beyond repair. The four locations are described as follows: S-28-36 (Pine Grove Road) over Twenty-Five Mile Creek in Kershaw County, S-40-69 (Congress Road) over Jumping Run Creek in Richland County, S-40-827 (Rockbridge Road) over Spring Lake in Richland County, and S-45-51 (Battery Park Road) over Black Mingo Creek in Williamsburg County. At both S-28-36 and S-45-51, the necessary work includes repairing roadway embankments, outside of the bridge approaches, that were also damaged during flooding.
Request for Proposals
Request for Proposals (Final)
(12/10/15)
Request for Proposals (Industry Review)
(02/4/15)
Attachment B - Supplemental Project Design Criteria
Environmental
- S-69 CE-B (12/4/15)
- S-827 CE-B (12/4/15)
- S-36 CE-B (12/4/15)
- S-51 CE-B (12/4/15)
- S-51 CE-B Revised (12/10/15)
Forms
- Drilled Shaft Forms (12/4/15)
- Pile & Driving Equipment Data Form (12/4/15)
- Contractor Certification Form (12/4/15)
Roadway
- Drawing 805-710-SP (12/4/15)
Attachment C - Project Information Package
Geotechnical
- S-69 Geotech - PGSDR (12/4/15)
- S-827 Geotech - PGSDR (12/4/15)
- S-36 Geotech - PGSDR (12/4/15)
- S-51 Geotech - PGSDR (12/4/15)
- S-69 Boring Logs (12/4/15)
- S-827 Boring Logs (12/4/15)
- S-36 Boring Logs (12/4/15)
- S-51 Boring Logs and CPT Data (12/4/15)
Roadway
- S-36 (Pine Grove Road) (12/4/15)
- S-51 (Battery Park Road) (12/4/15)
- S-69 (Congress Road) (12/4/15)
- S-827 (Rockbridge Road) (12/4/15)
Structures
- SI&Reports (12/4/15)
Traffic
- S-69 Congress Detour (12/4/15)
- Arcadia Lakes - East (12/4/15)
- Arcadia Lakes - West (12/4/15)
- S-36 Detour Quantities (12/4/15)
- S-36 Detour Plan (12/4/15)
Utilities
- Richland Utility Info (12/4/15)
- Other Utility Info (12/4/15)
- City of Columbia Info (12/4/15)
- TruVista Info (12/4/15)
- TriCounty Info (12/4/15)
- ERCPSD Info (12/10/15)
- Additional Utility Info (12/10/15)
Evaluation Team Meetings
An Evaluation Team meeting will be held on December 15, 2015 at 9:00 AM at SCDOT Headquarters in Room 421.
Evaluation Team Meeting Agenda - Proposal Distribution
An Evaluation Team meeting will be held on December 15, 2015 at 10:00 AM at SCDOT Headquarters in Room 421.
Evaluation Team Meeting Agenda - Proposal Evaluation
Notice to Parties Interested in Providing Design Build Services
Qualifications and/or proposals from any contracting entity must utilize the new ProjectWise electronic proposal submission system. The following information describes the process that teams should follow to access the SCDOT ProjectWise environment for proposal submissions and their respective project data using the new system. Please use this ProjectWise Account Setup & Requirements link to set up accounts.